Watson Flextime Impact Protection Gloves

Product Code:

These Work Armour, black and tan, cut-resistant gloves are X-large/10 and measure 10 inches in length. They are made of goatskin with spandex external and polyester lining. They are gunn cut and feature reinforcement on the thumb, knuckles, and index finger. They feature an elastic cuff and a Dryhide water-resistant palm. These impact-resistant gloves have full cut-resistance coverage and are uncoated.

Questions about this product?

CONTACT US NOW

Similar Products